|
Clamp Roof Systems
Technological
solutions which change conventional customs
Features such as the contemporary and aesthetical look it has when
compared with the alternatives, practical application and price
advantage, provides that many people prefers Metal Clamp Roof
Systems with confidence. Metal Clamp Roof Systems are one of the
unique products, creating a revolution on roofs, of Erk Çatı that
carries innovations to production line without hesitation by
pursuing technological systems closely...
The
sole option of problem-free and final solution on roofs
Metal Clamp Roof Systems which are produced by Erk Çatı with
superior technology as a result of various researches, removes the
problem of water insulation on roofs. Formed by mounting panels
connected by clamping system without getiing screwed and punctured,
Metal Clamp Roof Systems ensures the lasting comfort of users for
through long years by removing the possibility of water leakage
through the holes on the panel. Metal Clamp Roof Systems cause the
structures to gain an aesthetical view the hole-free, seamless and
smooth surface it forms at panel connection points.
Metal Clamp Roof Systems are preferred by many people with
confidence as the final solution brought in by Erk Çatı to the
problems faced on roofs for years. |
Superior
Advantages of Technological Solution
Superior load
bearing capacity and endurance
As Erk Çatı Clamp Roof Systems provide an additional
structural endurance on roofs with small beams formed lengthwisely
as a result of clamp system on panels, they also improves the
bearing capacity of the roof. This structural endurance also
improves significantly the resistance against the snow load
accumulating on the roof. Production of Erk Çatı Clamp Roof
Systems from painted and galvanized or 55% aluminum-zinc coated
sheet, also prevents the product from getting affected by weather
conditions twice. This superior property of the system causes the
sheet, the raw material of the product, to gain resistance against
humidity, abrasion, chemical reaction, corrosion and tearing.
High
quality and economic
As a unique product provided by Erk Çatı for construction sector,
Erk Çatı Clamp Roof System brings together the superior Erk Çatı
quality it holds and economy on the same point; ones preferring
this perfect alternative on roofs gain a lot by all means.
The practical application characteristics of the connection
details in Erk Çatı Clamp Roof Systems enables the performance of
assembly with ease.
As being lighter of the panels forming the system when compared
with other coating materials enables to save shipping and roof sub-construction
materials, these unique properties of the system also provides
extra benefit for the users from labour and assembly time.
Panels forming Clamp Roof System are not only used on roofs of new
buildings, but can be applied on existing roofs without removing
the roof.Since the production and mounting period of the panels
are very short and they can be produced with the desired
dimensions, outages can be reduced to minimum and such properties
provide the economicness of Erk Çatı Clamp Roof Systems when
compared with other coating materials.
Aesthetical and modern look
With the ability to form the clamps in one piece from ridge to
eave on the roof, and the shading and tissue lines appearing in
the general look of the roof, an aesthetical and modern look is
provided for the structure. Applicability of the system to
different roof types (public buildings, commercial buildings,
houses etc.) with ease also enables architectural variety. |
Metal Kenet Tipleri
| 1100 Series |
 |
| 1300 Series |
 |
| 2000 Series |
 |
|
1100 Series
Clamp Roof Systems |
 |
|
CLIP – CLAMP CONNECTION |
 |
1300 Series
Clamp Roof
System Load Carrying Table
CLIP – CLAMP CONNECTION |
 |
| 2000
Series
Clamp Roof System Load Carrying Table |
 |
Erk Çatı Clamp
Roof System Application Methods
Erk Çatı Clamp Roof Systems can be applied in two different ways.
1.On the carrier construction (wooden or metal)
water-resistant plywood (10-20 mm.), heat insulation material with
efficient thickness, humidity blocking membrane and clamp roofing
material is laid down and clamping is made in turn.
2.Humidity blocking membrane and clamp roof material is laid
down and clamping is made in turn on the flat type metal covering
structure in which heat insulation material is furnished.
The special clip elements must be stabilized with an interval of 60
cm. before clamping is made in both options.
Clamp Roof
System Application Methods
Mounting Instructions For Maximum Efficiency
 |
 |
 |
|
1.Flooring roof cover |
2.Carrying the clamp roof panels to mounting area |
3.Attaching the clips for stabilization of the clamp roof panels |
 |
 |
 |
|
4.Screwing the attached clips |
5.Assembly of the panels as to clamp profile |
6.Clamping the panels in place manually or by clamping machine |
 |
|
|
|
7.Completing the assembly by applying the other panels in the same
way |
|