Clamp Roof Systems

Technological solutions which change conventional customs
Features such as the contemporary and aesthetical look it has when compared with the alternatives, practical application and price advantage, provides that many people prefers Metal Clamp Roof Systems with confidence. Metal Clamp Roof Systems are one of the unique products, creating a revolution on roofs, of Erk Çatı that carries innovations to production line without hesitation by pursuing technological systems closely...

The sole option of problem-free and final solution on roofs
Metal Clamp Roof Systems which are produced by Erk Çatı with superior technology as a result of various researches, removes the problem of water insulation on roofs. Formed by mounting panels connected by clamping system without getiing screwed and punctured, Metal Clamp Roof Systems ensures the lasting comfort of users for through long years by removing the possibility of water leakage through the holes on the panel. Metal Clamp Roof Systems cause the structures to gain an aesthetical view the hole-free, seamless and smooth surface it forms at panel connection points.
Metal Clamp Roof Systems are preferred by many people with confidence as the final solution brought in by Erk Çatı to the problems faced on roofs for years.

Superior Advantages of Technological Solution

Superior load bearing capacity and endurance
As Erk Çatı Clamp Roof Systems provide an additional structural endurance on roofs with small beams formed lengthwisely as a result of clamp system on panels, they also improves the bearing capacity of the roof. This structural endurance also improves significantly the resistance against the snow load accumulating on the roof. Production of Erk Çatı Clamp Roof Systems from painted and galvanized or 55% aluminum-zinc coated sheet, also prevents the product from getting affected by weather conditions twice. This superior property of the system causes the sheet, the raw material of the product, to gain resistance against humidity, abrasion, chemical reaction, corrosion and tearing.
High quality and economic
As a unique product provided by Erk Çatı for construction sector, Erk Çatı Clamp Roof System brings together the superior Erk Çatı quality it holds and economy on the same point; ones preferring this perfect alternative on roofs gain a lot by all means.
The practical application characteristics of the connection details in Erk Çatı Clamp Roof Systems enables the performance of assembly with ease.
As being lighter of the panels forming the system when compared with other coating materials enables to save shipping and roof sub-construction materials, these unique properties of the system also provides extra benefit for the users from labour and assembly time.
Panels forming Clamp Roof System are not only used on roofs of new buildings, but can be applied on existing roofs without removing the roof.Since the production and mounting period of the panels are very short and they can be produced with the desired dimensions, outages can be reduced to minimum and such properties provide the economicness of Erk Çatı Clamp Roof Systems when compared with other coating materials.
Aesthetical and modern look
With the ability to form the clamps in one piece from ridge to eave on the roof, and the shading and tissue lines appearing in the general look of the roof, an aesthetical and modern look is provided for the structure. Applicability of the system to different roof types (public buildings, commercial buildings, houses etc.) with ease also enables architectural variety.


Metal Kenet Tipleri

1100 Series
1300 Series
2000 Series

1100 Series Clamp Roof Systems
CLIP – CLAMP CONNECTION

 

1300 Series Clamp Roof System Load Carrying Table
CLIP – CLAMP CONNECTION

 

2000 Series Clamp Roof System Load Carrying Table

Erk Çatı Clamp Roof System Application Methods

Erk Çatı Clamp Roof Systems can be applied in two different ways.
1.On the carrier construction (wooden or metal) water-resistant plywood (10-20 mm.), heat insulation material with efficient thickness, humidity blocking membrane and clamp roofing material is laid down and clamping is made in turn.

2.
Humidity blocking membrane and clamp roof material is laid down and clamping is made in turn on the flat type metal covering structure in which heat insulation material is furnished.
The special clip elements must be stabilized with an interval of 60 cm. before clamping is made in both options.


Clamp Roof System Application Methods

Mounting Instructions For Maximum Efficiency

1.Flooring roof cover

2.Carrying the clamp roof panels to mounting area

3.Attaching the clips for stabilization of the clamp roof panels

4.Screwing the attached clips

5.Assembly of the panels as to clamp profile

6.Clamping the panels in place manually or by clamping machine

   

7.Completing the assembly by applying the other panels in the same way